Providing Investor’s supervision of the renovation and adaptation
of school buildings,
such as school canteen with back-up facilities and a gym. Total volume of
the objects –
3550 m3.
Providing Investor’s supervision of the make over and adaptation of school buildings OSiW in Międzyrzecz. Total volume of the objects – 2100 m3.
Investor’s supervision over the construction of a sewage system with
connections for the following localities:
Chwalimierz, Jugowiec, Kryniczno, length of the network 14,4 km,
3 pump
stations.
Investor’s supervision over the implementation of an investment project: “Construction of medical wastes incineration plant of ATI MULLER –France” at the Specialist Hospital in Piła, 64-920 Piła, Rydygiera Street 1.
MULTI-SPECIALIST HOSPITAL
IN NOWA SÓL
Investor’s supervision over the project: “Thermal modernisation of the hospital buildings”. The area of thermal insulation 2670 m2.
Investor's supervision over the replacement of the thermal network on the hospital's area, scope of the work included process steam network, central heating and domestic hot water. The networks have been made from steel and polyethylene pipes "BRUGG". Total length of the network: L: 3480,6 m.
COMMUNE OFFICE GRĘBOCICE
Investor’s supervision over the rebuilding of a road near the industrial waste deposit Żelazny Most - placing asphalt surface; precinct Krzydłowice, precinct Rudna. Total length of the road – 1.1 km.
Investor’s supervision over the renovation of an old community centre building in a locality Bucze, commune Grębocice. The volume of the community centre building. – 900.50 m3.
Providing services of an independent supervision inspector of the
building-construction speciality during the construction and modernization
of the following buildings: workshop -warehouse
of the volume 12550
m3 and a warehouse building of the volume 7860 m3.
COMMUNE OFFICE JERZMANOWA
Investor’s supervision of the close and recultivation of other than dangerous and neutral wastes deposit at the locality Jaczów, commune Jerzmanowa. The plot of land number 642/4, the plot area 0,8591 ha.
Investor’s supervision over the building of a road in Ogrodowa Street in Jaczów (length 1110 linear meters).
Investor’s supervision over the implementation of a project
“Construction
of a village community centre building
with infrastructure and a parking lot in the locality Potoczek.
Investor’s supervision over the building of sports back-up
facilities with infrastructure
at the locality Potoczek.
Investor’s supervision over the implementation of the project:
“Building of a village community centre together with
the infrastructure and a parking lot
in the locality Bądzów.
Investor’s supervision over the building of
a firehouse
with back-up facilities and accompanying infrastructure in Jaczów.
Investor’s supervision over the building of
an elementary
school gym in Jaczów.
Providing Investor’s supervision over the investment project “Renovation of the Market Square and Daszyńskiego Street”.
Investor’s supervision over the construction of a sewage system with a pump station at the village Stare Serby, district Głogów.
Providing the function of a Substitution Investor at the construction of a sewage system with water supply network in the locality Gaworzyce – Stage II and Stage III.
Investor’s supervision over the construction of a sewage system with connections for the localities: Radwanice, Łagoszów Wielki, Pudło – Stage I, II, III, IV V. The length of the sewage network – 10 km.
Providing Investor’s supervision over the complex construction “Heating System in the municipality of Świerzawa”, using biomass – thermic power of a biomass boiler 1,0MWt.
Providing Invertor’s supervision over the construction of a sewage system with connections, Stage IV and V, length of the network 8 km.
Investor’s supervision of the replacement of the heating network of
pre-insulated pipes, twice ⌀ 400 mm, from the heating chamber
in
Keplera Street to the heating chamber in Wojska Polskiego Street in Głogów. The
total length: 1200 m.
Providing Investor’s supervision over
the assembly and
commissioning of
a technological line of belt conveyors,
chain conveyor,
container conveyors, steel containers and reinforced concrete containers
conveyors.
STRZEGOM
Investor’s supervision over the task: 'Thermomodernization of the
Public Elementary School No. 98 building in
Jaroszów and of the Public Elementary
School No.4 gym building in Strzegom.'
Investor's supervision over the task: 'The exchange of the heating network for an equivalent in the technology of pre-insulated pipes in the area of Przylesie estate in Lubin, dolnośląskie.'
JAWOR
Rebuilding of the gas boiler room and
central heating system
together with the thermomodernization in the 1st
General School Team in Jawor.
BOLKÓW
Investor's supervision over the task: 'Increasing the energy efficiency of the School Team of Agribusiness building in Bolków with a chance to reduce the emission of harmful substances into the atmosphere'.
COMMUNE OFFICE DOBROMIERZ
Investor's supervision over the task: 'Thermomodernization of the Elementary School building in Dobromierz together with the modernization of central heating.'
Thermomodernization of the Elementary School building in Gniewków (commune Dobromierz) together with the modernization of the central heating system.
EKO-ENERGIA operates on the market since 2003. During that time we have prepared numerous expert opinions, designs, supervisions and reports in the following fields: industrial design, environment protection, power generation, renewable energy wind energy included.
© EKO-ENERGIA 2024